User-Centric Experience Broadband for All Business Critical Communications End-to-End IP Transformation

TASbits is an "infoletter" devoted to the global urban rail transit industry. TASbits is intended to educate and stimulate discussion about the benefits of Communications-Based Train Control (CBTC, also known as Transmission-Based Train Control or TBTC) and routing technologies applicable to heavy metro, light rail, trams, commuters and automated people movers. Articles address technology for efficiency and safety improvements, methods for easy entry into the world of CBTC, and for those who have readily adopted CBTC methodology, articles about Alcatel´s approaches and solutions to meet higher performance needs.

Download Issue 10 (June 2006)

Content:
  • Shanghai new N° 6 metro line CBTC contract

  • Yard Automation: The Vancouver SkyTrain Experience

  • Traction Energy Saving Studiesfor KCRC’s West Rail





  • TASbits
    Download Issue 9 (April 2006)

    Content:
  • DLR Extension to London City Airport Opens with SelTrac S40 CBTC

  • Growth of London's Driverless Docklands Light Rail System

  • Fall-back Operation in CBTC Systems





  • TASbits
    Download Issue 8 (November 2005)

    Content:
  • MTR's Hong Kong Disneyland Resort Line

  • Dealing with mixed-mode operation

  • Radio Data Networks for CBTC in Urban Transit: Cellular Circuits vs Wireless LAN





  • TASbits
    Download Issue 7 (August 2005)

    Content:
  • Alcatel awarded USD 250 M contract for Dubai Metro

  • Moving to fully automatic operations

  • Chasing technology

  • Communications system - Las Vegas monorail





  • TASbits
    Download Issue 6 (March 2005)

    Content:
  • KCRC inaugurates Mo On Shan Line

  • Setting your sights on better operation flexibility

  • Axle counter system use improves positive crossing starts

  • Customer training enables safe and efficient system operation





  • TASbits
    Download Issue 5 (November 2004)

    Content:
  • Five open-standard wireless CBTC rapid transit systems

  • The axle counter - a better alternative to track circuits

  • Taking advantage of Ethernet and RF

  • Continuous improvement with CMM





  • TASbits
    Download Issue 4 (January 2004)

    Content:
  • Radio Communication. Securing 802.11 Safely.

  • Getting Better Performance From Electronic Interlockings

  • More Benefits From the Use of Simulators

  • KCR West Rail Inaugurated December 20, 2003





  • TASbits
    Download Issue 3 (October 2003)

    Content:
  • Bandwidth Requirements for CBTC and CCTV

  • Alcatel´s Simulators for Quality Testing

  • Alcatel wins major London Underground re-signaling contract





  • TASbits
    Download Issue 2 (April 2003)

    Content:
  • Open Standard CBTC Wireless Technology

  • CBTC EnVISIONeering

  • Facilitating Cut-over Re-Signaling

  • Quality

  • Going the Extra Yard






  • TASbits
    Download Issue 1 (October 2002)

    Content:
  • Cost Effective Migration

  • The Realization of Interoperability

  • Open Standards

  • Radio CBTC a "First"

  • Beyond Rout-Centric Control

  • Pioneering Radio Control




  • TASbits
    TAS Online Product Guide
    TAS Online Product Guide
    TAS Brochures
    TAS Brochures
    Read and download TAS brochures
    TAS Ads
    TAS Advertisement Campaign
    Copyright © 2006-2008 Alcatel-Lucent. All rights reserved.